Finishing work for mosque building / Muhamad Fikry Mohd Noor

Mohd Noor, Muhamad Fikry (2015) Finishing work for mosque building / Muhamad Fikry Mohd Noor. [Student Project]

Abstract

This report, described about the types and materials that use on wall, floor, staircase and roof finishes on site of “Cadangan membina dan menyiapkan sebuah bangunan masjid 2 tingkat jenis lantai gantung dan lain-lain kerja yang berkaitan di Masjid Jamek Kampung Tui, Muar, Johor. This report was reported based on the observation and experience of four months at the construction project. This report is divided into several parts with beginning with an introduction, organizational background, case study, problem and recommendation, and conclusion. From the observation, the installation and operation process of finishes were very complex. This report explain how to install the wall, floor, staircase and roof finishes at site project very detail step by step. Then, this report delivered some suggestions to solve the problem. In conclusion, this report explained and described about the types and materials of wall, floor, staircase and roof finishes at site project that involve in this report.

Metadata

Item Type: Student Project
Creators:
Creators
Email / ID Num.
Mohd Noor, Muhamad Fikry
2012290268
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Ahmad, Nur Azfahani
UNSPECIFIED
Subjects: N Fine Arts > NA Architecture
N Fine Arts > NA Architecture > Mosques
T Technology > TH Building construction
T Technology > TH Building construction > Decoration and decorative furnishings
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus
Programme: Diploma in Building Surveying
Keywords: Mosque building
Date: 2015
URI: https://ir.uitm.edu.my/id/eprint/61455
Edit Item
Edit Item

Download

[thumbnail of 61455.pdf] Text
61455.pdf

Download (596kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:

ID Number

61455

Indexing

Statistic

Statistic details