Abstract
Autokeen Sdn Bhd (AKSB) is a company that produced automotive parts for major car manufacturers in Malaysia. However, the current production is behind the production plan. Based on initial observations, the problems occurred were due to inaccurate cycle time and poor Standard Operating Procedure (SOP). To overcome these problems, improvement of cycle time at large and medium press line is intended. Based on the production volume for these press lines, Pareto chart has been applied to highlight the most critical and fast moving parts for further improvement. Time study and standardized work combination table have been used as tools to measure and to improve the cycle time. More efficient and effective SOP have been established. Thus, the productivity has been improved by reducing wastes such as unnecessary movement, WIP and waiting time.
Metadata
Item Type: | Student Project |
---|---|
Creators: | Creators Email / ID Num. Nor Shahid, Nor Haryani 2013495128 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Ismail, Azianti (Profesor Madya Dr) 205106 |
Subjects: | T Technology > TS Manufactures > Production management. Operations management > Production control > Just-in-time systems T Technology > TS Manufactures > Production management. Operations management > Manufacturing processes. Lean manufacturing |
Divisions: | Universiti Teknologi MARA, Johor > Pasir Gudang Campus > Faculty of Mechanical Engineering |
Programme: | Bachelor of Engineering (Hons) (Mechanical) |
Keywords: | Standard Operating Procedure (SOP), Increase productivity, Waste control |
Date: | July 2016 |
URI: | https://ir.uitm.edu.my/id/eprint/61141 |
Download
61141.pdf
Download (135kB)