Abstract
The main purpose of this project is to implement the skills and knowledge from our study in course Electrical Engineering. Furthermore, we hope the objective of this project are achievable and give the opportunity for mall management to create a better parking system in the future. The first parts of this project are discussions with the supervisor. Which are handle in every week, to create and form work the circuits. Final Year Project 1 are mainly the embodiment of our real project which are only consist of planning and construct the circuit use for Final Year Project 2. The second parts of this project are about teamwork with partner which is really important to ensure the works are done by the due date. In progress of this project, the works are given out equally.
Metadata
Item Type: | Student Project |
---|---|
Creators: | Creators Email / ID Num. Roslan, Muhammad Aiman Asraf UNSPECIFIED Saifuddin, Muhammad Fikri Ikhwan UNSPECIFIED |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Muhamad, Dr Nur Amalina 320942 |
Subjects: | T Technology > TK Electrical engineering. Electronics. Nuclear engineering > Automatic tracking T Technology > TL Motor vehicles. Aeronautics. Astronautics > Parking facilities. Including parking lots and parking garages |
Divisions: | Universiti Teknologi MARA, Johor > Pasir Gudang Campus > Faculty of Electrical Engineering |
Programme: | Diploma In Electrical Engineering |
Keywords: | Parking garages, Automobile parking |
Date: | 2015 |
URI: | https://ir.uitm.edu.my/id/eprint/59429 |
Download
59429.pdf
Download (475kB)