Procedure of post contract administration, case study: Damansara City 2, Kuala Lumpur / Intan Nor Atika Zainal Abidin

Zainal Abidin, Intan Nor Atika (2016) Procedure of post contract administration, case study: Damansara City 2, Kuala Lumpur / Intan Nor Atika Zainal Abidin. [Student Project]

Abstract

In this chapter is about the detail of HeiTech Padu Berhad which is including the owner of the property, building background, project brief, list of major occupants, all the information of the building has been obtained from the Facilities Manager of KCSB Maintenance Services Sdn. Bhd. The building is located at Subang Jaya USJ/1 near to SEGi Collage and The Summit shopping mall. The building had a beautiful view from everywhere side especially right side overlooking the Shah Alam expressway. It is also state seat constituency between Shah Alam and Petaling Jaya. Kayangan Cahaya Sdn Bhd is outsource for HeiTech Padu Village of maintenance service to maintain the building at every part of services. HeiTech Padu at USJ 1 is the main office which is had more than 10 department. Kayangan Cahaya is another department on the building but also have been moved to back side of the building, at Impian Meridian. The owner of the building Heitech Padu Berhad is Permodalan National Berhad or the National Equity Corporation. The policy of PNB is to help rectify the economic imbalance in the Malaysian society. Heitech Padu Berhad is outsourcing contract from PNB, responsibility Heitech Padu Berhad is need to manage the building with the best possible.

Metadata

Item Type: Student Project
Creators:
Creators
Email / ID Num.
Zainal Abidin, Intan Nor Atika
2014892174
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Mohammad Ali, Irwan
UNSPECIFIED
Subjects: T Technology > TH Building construction
T Technology > TH Building construction > Management of the construction site. Superintendence of building construction
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Programme: Diploma in Building Surveying
Keywords: Procedure of post contract administration, Damansara City 2, Kuala Lumpur
Date: 2016
URI: https://ir.uitm.edu.my/id/eprint/56590
Edit Item
Edit Item

Download

[thumbnail of 56590.pdf] Text
56590.pdf

Download (853kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:

ID Number

56590

Indexing

Statistic

Statistic details