Repairing work / Nazatul Ain Md Saukeri

Md Saukeri, Nazatul Ain (2017) Repairing work / Nazatul Ain Md Saukeri. [Student Project]

Abstract

Practical training takes 4 months before complete study Diploma in Building Survey. During 4 months practical at Jabatan Agama Islam Selangor (JAIS), there are too many subjects that I can learn. Student can have more knowledge the aspects of organizational management, technology, design, property, building economic and financing, law, communications, project planning and management. This course also can justify the relationship of various professionals and their practices in the building industry as well as the integration and cross subject analysis and energy. This course as well, makes the practical student learn more about the green building concept, more detail on building services, element and material that used for the building that chose to be case study . Besides, we also can know the detail about the building construction, elements and specifications.

Metadata

Item Type: Student Project
Creators:
Creators
Email / ID Num.
Md Saukeri, Nazatul Ain
2014452168
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Hashim, Siti Zubaidah
UNSPECIFIED
Subjects: T Technology > TH Building construction
T Technology > TH Building construction > Maintenance and repair
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Programme: Diploma in Building Surveying
Keywords: Repairing work, Jabatan Agama Islam Selangor (JAIS), Building concept
Date: 2017
URI: https://ir.uitm.edu.my/id/eprint/56516
Edit Item
Edit Item

Download

[thumbnail of 56516.pdf] Text
56516.pdf

Download (629kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:

ID Number

56516

Indexing

Statistic

Statistic details