Requisition process / Nurul Izzah Hanifah

Hanifah, Nurul Izzah (2021) Requisition process / Nurul Izzah Hanifah. [Student Project] (Unpublished)

Abstract

The construction industry in Malaysia is growing rapidly in line with the country's development. It doesn't matter where because this field is very common in the global community. Along with that, some new buildings are constantly being built and some buildings that have been built need to be repaired because the situation is bad and cause damage. Therefore, the number of contractors is also increasing due to high demand in our country. One of the ways to get government projects in Jerantut district is through the Pejabat Daerah Dan Tanah Jerantut under the Kuantan City Council of Pahang. There are several methods for contractors to obtain projects, namely requisition, direct appointment, tender, and quotation. Therefore, this report will focus on the requisition process. This method is very simple, sincere, and fast compared to other methods. This report is made to find out what is meant by the requisition method and the procedure that needs to be done to apply for a project under this requisition process.

Metadata

Item Type: Student Project
Creators:
Creators
Email / ID Num.
Hanifah, Nurul Izzah
2019762305
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Rosman, Muhammad Redza
UNSPECIFIED
Subjects: T Technology > TH Building construction
T Technology > TH Building construction > Systems of building construction. Industrialized building
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Programme: Diploma in Building
Keywords: Construction industry
Date: 2021
URI: https://ir.uitm.edu.my/id/eprint/55993
Edit Item
Edit Item

Download

[thumbnail of 55993.pdf] Text
55993.pdf

Download (480kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:

ID Number

55993

Indexing

Statistic

Statistic details