Abstract
Green building is already existing longer in construction industry and many countries had succeeded to implement the technology. But in Malaysia, many barriers have identified due to green building adoption especially among the consultant team. Quantity surveyors are to perform financial control, cost and contractual administration of a project from inception to completion. But they also agreed that, the evolution of the quantity surveying profession due to changes from traditional to green construction become challenges and global threats. The aim of this study is to establish the best practice of green building implementation in Malaysia from quantity surveyors’ profession. The objective is to identify the barriers of green building implementation during pre-contract stage. The method used was questionnaire survey and the responses were from 56 quantity surveyors who involved in green building projects in Malaysia. The data collected analyzed by SPPS version 25. This study identified that the highest mean value for barriers of green building implementation during pre-contract stage is during tendering stage longer time during the selection process and lack of experience in green projects.
Metadata
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Creators: | Creators Email / ID Num. Mohd Ridah, Rabbiatul Rejina rabiatul.rejina123@gmail.com Husin, Husrul Nizam husrul82@perak.uitm.edu.my |
Subjects: | N Fine Arts > NA Architecture > Sustainable architecture N Fine Arts > NA Architecture > Sustainable architecture > Malaysia T Technology > TH Building construction > Architectural engineering. Structural engineering of buildings T Technology > TH Building construction > Architectural engineering. Structural engineering of buildings > Sustainable buildings. Sustainable construction |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus |
Event Title: | 4th Undergraduate Seminar on Built Environment and Technology 2019 |
Event Dates: | 12th June 2019 |
Page Range: | pp. 101-103 |
Keywords: | Barriers; Green Building; Pre-contract Stage |
Date: | 2019 |
URI: | https://ir.uitm.edu.my/id/eprint/51929 |