Abstract
The main objective for this Final Project is to complete our Diploma Level at University Technology Mara as this is the requirement for our program and it carries 4 credit hour. Other objective is for us to learn in detail about air-conditioning system. In Building Services course we just learn main subject, but the Final Year Project deals with details such as calculating air-conditioning heat load right through estimating cost. We treat this like a real job for an engineer. This Final Project also exposes student to the problems in engineering field and the right approach to solve the problems. When they work later, they can apply the knowledge that they have learned as in actual engineering works. Lastly this final project gives use an experience to develop our creativities and report writing in the field of Mechanical Engineering
Metadata
Item Type: | Student Project |
---|---|
Creators: | Creators Email / ID Num. Shamsudin, Azhar 2000416939 Mohd Muner, Mohd Sharizan 2000416793 |
Contributors: | Contribution Name Email / ID Num. Advisor Rasid, Zulkifli UNSPECIFIED |
Subjects: | T Technology > TH Building construction T Technology > TH Building construction > Heating and ventilation. Air conditioning T Technology > TH Building construction > Heating and ventilation. Air conditioning > Malaysia |
Divisions: | Universiti Teknologi MARA, Pulau Pinang > Permatang Pauh Campus > Faculty of Mechanical Engineering |
Programme: | Diploma of Mechanical Engineering |
Keywords: | Air-Conditioning, Services, Engineer |
Date: | May 2003 |
URI: | https://ir.uitm.edu.my/id/eprint/50812 |
Download
50812.PDF
Download (114kB)