Bank Rakyat Twin Tower Kuala Lumpur Wilayah Persekutuan Kuala Lumpur / Muhammad Fikri Rahiim ... [et al.]

Rahiim, Muhammad Fikri and Che Wil, Muhammad Azri and Mohamad Azaman, Muhammad Azizi Fahmi and Salim, Nur Syahida (2016) Bank Rakyat Twin Tower Kuala Lumpur Wilayah Persekutuan Kuala Lumpur / Muhammad Fikri Rahiim ... [et al.]. Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Abstract

This report is about the Bank Rakyat Facilities Management for Tower 2. This report include the maintenance used at the building, type of system used and building condition assessment of this building. While doing an interview with the person incharge, we get all the information that need to be stated in this report except for the financial cost. We only managed to get the estimate price for the financial. Besides
financial, we also need to figure out what types of maintenance strategy used in this building. For example, this building used Key Performance Indicator, Penalty. Deduction, Planned and Unplanned Maintenance. This report also explain about the complaint process for breakdown and corrective maintenance. Each of maintenance works needs to have procedure and get permission from the operation manager before conducting any works. They also provided the maintenance schedule for each services and system. The schedule consist of daily, weekly, monthly, 2m, yearly, one and half yearly, 2years, 10years and 20years. For the organization chart, they have company and maintenance chart. For the maintenance organization chart, they have in-house and out-source maintenance. For
in-house, it’s consists of General Management Operation Manager, Management Executive, Admin Executive and Auxiliary Police. For out-source, it’s consists of charge man, handyman, Chulia Facilities and Lane Parking. Each of the person in-charge have their own scope of works. For example, General Manager task is develops strategic plan by studying technological and financial opportunities, presenting assumptions, recommending objectives and accomplishes
subsidiary objectives by establishing plans, budgets, and results measurements, allocating resources, reviewing progress, making mid-course corrections. This report also explain the building design and concept used for the building. As were stated in chapter 4, this building used Modern Contemporary Architecture style with the combination of geometric Islamic pattern as motif. Modern Contemporary
Architecture style a broad classification of recent building designs that has found frequent expression in both residential and commercial buildings.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Rahiim, Muhammad Fikri
2014685346
Che Wil, Muhammad Azri
2014221076
Mohamad Azaman, Muhammad Azizi Fahmi
2014885616
Salim, Nur Syahida
2014658132
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Baharuddin, Mohd Nurfaisal
UNSPECIFIED
Subjects: T Technology > TH Building construction > Maintenance and repair
T Technology > TH Building construction > Building inspection
T Technology > TH Building construction > Building fittings and their installation
T Technology > TH Building construction > Building fittings and their installation > Maintenance and repair
T Technology > TH Building construction > Architectural engineering. Structural engineering of buildings
T Technology > TH Building construction > Architectural engineering. Structural engineering of buildings > Sustainable buildings. Sustainable construction
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Keywords: Building, Maintenance, Bank Rakyat Facilities Management
Date: 2016
URI: https://ir.uitm.edu.my/id/eprint/50165
Edit Item
Edit Item

Download

[thumbnail of 50165.pdf] Text
50165.pdf

Download (175kB)

ID Number

50165

Indexing

Statistic

Statistic details