Abstract
This report is content all about the information about my case
study through practical training under company Jabatan Kerja Raya (JKR) Besut during the four months of practical training. The topic that I have choose to complete my practical training report is construction process of upgrading parking grow1d from crusher rm1 pavement to reinforced concrete slab because the stage of construction project in undergoing is dw·i.t1g my practical period. This report has a 5 chapter
which included all infonnation about the company, general
information about case study, information about case study which is focus on specific topic that I have choose, and also problems and recommendation that have been analysed.
The first chapter in this report is detail of information of the
company. In this chapter, all the general information about the
background of the company and the organization that owned by company that I choose to undergo the practical training. It also content about the scope of work about this company, objective, mission, vision, location, and also panel company which is involved with the JKR Besut. The second chapter give out infonnation about the literature review based on my case study. All the general infonnation and overview about the topic that I have choose is included in this chapter. It content about the definition, types and etc.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Mohd Ropi, Mohd Firdaus 2015891844 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Mohd Bahari, Mariaty UNSPECIFIED |
Subjects: | H Social Sciences > HE Transportation and Communications > Traffic engineering. Roads and highways. Streets H Social Sciences > HE Transportation and Communications > Traffic engineering. Roads and highways. Streets > Parking. Automobile parking T Technology > TE Highway engineering. Roads and pavements > Roads > Malaysia T Technology > TE Highway engineering. Roads and pavements > Materials for roadmaking |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | Building, Parking, Construction process |
Date: | 2018 |
URI: | https://ir.uitm.edu.my/id/eprint/49685 |