Halmi, Muhamad Naquib
(2017)
Maintenance work for air-conditioning system and cooling tower at Pantai Hospital Manjung / Muhamad Naquib Halmi.
Industrial Training.
Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.
(Unpublished)
Abstract
The practical training takes 4 months to complete the study taking the diploma as a Building Surveyor. The maintenance programme that applied at this Hospital was systematically for this building. The services of this building are well-maintained. Thoroughly, the subject that had been chosen for practical reports are maintenance of cooling tower and air-conditioning The problems in this building only is air-conditioning due the temperature is not cold. This department receive many complaints from the Operation Theatre (OT) that the people inside the department is hot. so this department had decided to run 2 chiller for one day starts from 6.00 am – 5.30 pm.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Halmi, Muhamad Naquib 2014857344 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Jamaludin, Nazhatulzalkis UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Heating and ventilation. Air conditioning T Technology > TH Building construction > Heating and ventilation. Air conditioning > Malaysia T Technology > TH Building construction > Architectural engineering. Structural engineering of buildings T Technology > TH Building construction > Architectural engineering. Structural engineering of buildings > Sustainable buildings. Sustainable construction |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | Maintenance work, Air-conditioning, Cooling tower |
Date: | 2017 |
URI: | https://ir.uitm.edu.my/id/eprint/46361 |