Abstract
Preventive maintenance is one of scope of building surveyor and main core of a building surveying. For a building that requires maintenance, we need to identify the element and material used in the building in order to identify the period of maintenance. Maintenance is needed especially new building in order to decrease the defects that can reduce the building lifespan and can harm the occupants. For my case study, I choose Institut Perindustrian Ledang, Johor. The building was officially began operations on 13 October 2000 with the first intake of trainees was held on January 8, 2001. The cost of the overall expenses including building and equipment is RM170 million.
The gutter used in Institut Latihan Perindustrian is half-round gutter . During my inspection the gutter, Pusat Pentadbiran and Bengkel A at the Institut Latihan Perindustrian Ledang has the worst condition as it has many problems.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Khalib, Nur Khalimah 2013240014 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Ahmad Zawawi, Zuraihana UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Maintenance and repair T Technology > TH Building construction > Building inspection T Technology > TH Building construction > Building failures, errors, defects, etc. T Technology > TH Building construction > Architectural engineering. Structural engineering of buildings T Technology > TH Building construction > Architectural engineering. Structural engineering of buildings > Sustainable buildings. Sustainable construction |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Programme: | Diploma in Building Surveying |
Keywords: | Maintenance, Gutter, Building Surveyor |
Date: | 2016 |
URI: | https://ir.uitm.edu.my/id/eprint/45759 |