A study on handling process of Industrialised Building System (IBS)/ Tuan Maizan Tuan Muda.

Tuan Muda, Tuan Maizan (2010) A study on handling process of Industrialised Building System (IBS)/ Tuan Maizan Tuan Muda. Degree thesis, Universiti Teknologi MARA.

Abstract

Industrial Building System (IBS) is defined as a construction system which components are process fully industrialized production, on or off site, positioned and assembled technique into structures with minimal additional site work. This is opened building system currently applied in Malaysia especially for educational building, residential building, office building and others. The handling process mainly involves the removal of the precast element from factory, transportation to storage of yard or directly to construction site. The defect will be occur during the handling process at transportation, storage of factory or storage at construction project if the process is not properly/Also, if the process is not regarding the guideline and handling procedure it more 'Susceptible in precast design strength, durability and work-ability. Especially for element-of large element such as long span structure ( roof trusses ), and large size of floor element and wall element, it must provided the temporary bracings or ties for safe handling. These research objectives is to analysis the handling process of precast concrete in Industrialised Building System (IBS) in manufacture and the construction project in Malaysia. The second objective is identifies the defect and problem during delivery process and last research is to find out the solution for a better handling process for precast concrete. This research to prove that the handling process of precast concrete method has significant in manufacture and construction project in Malaysia. A typical manufacture and construction project using the widely popular precast concrete or IBS method needs to be selected for the study purposes. This study also could improved and upgrade the handling process of precast concrete in Malaysia.

Metadata

Item Type: Thesis (Degree)
Creators:
Creators
Email / ID Num.
Tuan Muda, Tuan Maizan
2007289174
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Jabar, Izatul Laili
UNSPECIFIED
Subjects: T Technology > TH Building construction > Systems of building construction. Industrialized building
T Technology > TH Building construction > Maintenance and repair
Divisions: Universiti Teknologi MARA, Shah Alam > Faculty of Architecture, Planning and Surveying
Programme: Bachelor in Building Surveying (Hons)
Keywords: Industrialised Building System, Construction system, Handling process
Date: 2010
URI: https://ir.uitm.edu.my/id/eprint/44884
Edit Item
Edit Item

Download

[thumbnail of 44884.pdf] Text
44884.pdf

Download (173kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:
On Shelf

ID Number

44884

Indexing

Statistic

Statistic details