Planning and control of safety in the construction refurbishment project / Ahmad Ezanee Hashim.

Hashim, Ahmad Ezanee (2004) Planning and control of safety in the construction refurbishment project / Ahmad Ezanee Hashim. PhD thesis, Universiti Teknologi MARA.

Abstract

This study discusses a critical investigation into the needs for and interest in planning and control of safety in large refurbishment construction projects. The investigation attempted to determine from the viewpoint of large scale contractors, those critical factors which affected and influenced the safety planning and control process as well as identifying areas that affected safety of construction projects. This study also highlights the influence of the integrative mechanisms employed by refurbishment firms and their influence in safety planning performance. The integrative mechanisms include recording information, supervision and monitoring, work schedules, training and orientation and information technology systems. In addition, this study also discusses how the management organization structure of the construction firms influences the extent of the integrative mechanism used in safety planning performance. Further, it also examines the effects of employees' interest that affect and influence the safety planning and control process. A preliminary postal survey was sent to large construction firms initially, followed by semi-structured interviews with safety planning managers and supervisors of the construction firms. A final postal survey was distributed to 45-safety planning and control managers of refurbishment construction firms within the Klang valley. A total of 30 completed questionnaires were analyzed in detail and formed the database for the quantitative analysis. In addition, 14 semi-structured interviews were carried out on managers from the 30 responding construction firms. In this study both qualitative and quantitative studies were used. The result of the study indicated that there was a general lack of safety interest attitude among employees in the sample studied. The lack of safety interest was due to safety ignorance, negligence, lack of safety experience, violation of safety procedures and attitudes. This study showed that the control of safety performance level depends upon controlling the interfaces between the various stages of the refurbishment construction process, i.e. pre-bid, post-bid and construction process. The planning performance measurements this study used were, cost variance, loss time variance, accidents and the extent of planning in the refurbishment projects. This study also identified that the integration mechanisms to be adopted in the safety planning and control process were equally based on the complexity of refurbishment projects, the management safety accountability of the refurbishment organizations and the safety performance targeted.

Metadata

Item Type: Thesis (PhD)
Creators:
Creators
Email / ID Num.
Hashim, Ahmad Ezanee
UNSPECIFIED
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Torrance, Johan Victor (Prof. Dr.)
UNSPECIFIED
Subjects: T Technology > TH Building construction > Estimates. Measurements. Quantities and cost
T Technology > TH Building construction > Management of the construction site. Superintendence of building construction
T Technology > TH Building construction > Building fittings and their installation
T Technology > TH Building construction > Protection of buildings. Including protection from dampness, fire, burglary
Divisions: Universiti Teknologi MARA, Shah Alam > Faculty of Architecture, Planning and Surveying
Programme: Doctor of Philosophy
Keywords: Planning, Safety, Construction
Date: 2004
URI: https://ir.uitm.edu.my/id/eprint/43428
Edit Item
Edit Item

Download

[thumbnail of 43428.pdf] Text
43428.pdf

Download (176kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:

ID Number

43428

Indexing

Statistic

Statistic details