An improved operational framework for defects liability management system in design and build public hospital projects / Haryati Mohd Isa

Mohd Isa, Haryati (2014) An improved operational framework for defects liability management system in design and build public hospital projects / Haryati Mohd Isa. PhD thesis, Universiti Teknologi MARA.

Abstract

Contrary to the belief that the Design and Build (DB) procurement approach will result in better project outcomes, many DB projects, particularly public buildings are short of meeting the expectations. One of the major issues faced is the construction defects. Clients usually are at loss while trying to configures how this matter should be dealt with. Consequently, they normally end up rectifying most of the defects at their own cost. In appreciating the need to resolve this continuing problem, the government has introduced a Defects Liability Management (DLM) System by appointing a Service Provider (SP) to record and manage the defects identified during the Defects Liability Period (DLP). Realising the opportunity that can be learnt from this system in providing insights to improve the implementation of future projects, this research was mooted. The aim of this study is m develop an operational framework for improving the current DLM system practiced in DB public hospitals in Malaysia. Seven public hospitals are chosen as the case study. A mixed method approach was adopted for the research. The qualitative enquiry data was drawn from two main project documents namely Procedure Guideline Manuals (FGM) and Condition Appraisal Reports (CAR). The rationale for analysing PGM is to investigate the process of DLM System implemented and its comprehensiveness. Meanwhile, data for defects identified during the DLP were obtained by analysing CAR. The data were sorted, sieved, grouped and transferred into the SPSS software to identify the extant of the DLM System in providing insights to the problems along the project stage and hospital nature. Three statistical analyses were adopted namely (i) frequency analysis to analyse the defects pattern (ii) Two-way ANOVA to analyse the impact of work discipline and hospital towards number of defects and (iii) Chi-Square Test of Association to lost on the association of the defects occurrence with the project stage and hospital nature. The second stage of the research enquiry involved a two stage semi-structured interview with the hospital project terms and industry experts. The first stage interview was conducted to determine the comprehensiveness of the current process and to solicit recommendations for improvement. Finally, the improved operational framework was feasibly validated in the second stage interview. The qualitative data were convened and transcribed into Microsoft Word format and analysed manually. The findings suggest that with a comprehensive methodology in place, defects can be effectively traced and categorised to track their root cause and stages of occurrence. It is also established that there is a significant association between the defects occurrence with the project stages and the nature of the hospitals. Therefore, clients can have better recourse to address the issue of defects and provide lessons learnt to manage future projects. Notwithstanding this, the research also highlights the 1mponancc of appointing SP to manage defects during the DLP, particularly in complex projects. The research outputs seek to facilitate a comprehensive dimension of defects liability management process and provide significant impacts to the industry.

Metadata

Item Type: Thesis (PhD)
Creators:
Creators
Email / ID Num.
Mohd Isa, Haryati
2008577821
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Hassan, Padzil @ Fadzil (Assoc. Prof. Dr.)
UNSPECIFIED
Subjects: N Fine Arts > NA Architecture > Architecture in relation to special subjects
N Fine Arts > NA Architecture > Architectural drawing and design
N Fine Arts > NA Architecture > City planning. Regional planning
Divisions: Universiti Teknologi MARA, Shah Alam > Faculty of Architecture, Planning and Surveying
Programme: Doctor of Philosophy
Keywords: Operational framework, Defect Liability Management system, Design and Build, Hospital
Date: September 2014
URI: https://ir.uitm.edu.my/id/eprint/39753
Edit Item
Edit Item

Download

[thumbnail of 39753.pdf] Text
39753.pdf

Download (2MB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:
On Shelf

ID Number

39753

Indexing

Statistic

Statistic details