Modelling time performance for construction of public building projects in peninsular Malaysia / Hasli Ibrahim.
In:
The Doctoral Research Abstracts.
IPSis Biannual Publication, 2
(2).
Institute of Graduate Studies, UiTM, Shah Alam.
Abstract
Completing project on time is symbolic of an efficient construction project. However, project delay is a common issue in construction industry today. The failure in estimating reasonable construction duration will jeopardize the successful completion of the projects. There are needs to establish a tool in order to estimate construction time performance. Thus, this study focuses on developing a model to predict reasonable construction duration in order to improve construction time performance for public building projects in Peninsular Malaysia. This study cover four types of public sector building projects namely; school and education building; public building; health and medical building; and security building.
Metadata
Item Type: | Book Section |
---|---|
Creators: | Creators Email / ID Num. Ibrahim, Hasli UNSPECIFIED |
Subjects: | L Education > LB Theory and practice of education > Higher Education > Dissertations, Academic. Preparation of theses > Malaysia |
Divisions: | Universiti Teknologi MARA, Shah Alam > Institut Pengajian Siswazah (IPSis) : Institute of Graduate Studies (IGS) |
Series Name: | IPSis Biannual Publication |
Volume: | 2 |
Number: | 2 |
Keywords: | Abstract; Abstract of thesis; Newsletter; Research information; Doctoral graduates; IPSis; IGS; UiTM; Construction building |
Date: | 2012 |
URI: | https://ir.uitm.edu.my/id/eprint/19141 |
Download
Preview
ABS_HASLI IBRAHIM TDRA VOL 2 IGS 12.pdf
Download (252kB) | Preview