The effectiveness of risk manangement implemented on flyover projects in Kelantan

Mohamed, Arifatun Aqilah (2021) The effectiveness of risk manangement implemented on flyover projects in Kelantan. [Student Project] (Unpublished)

Abstract

This research is to observe and analyze the effectiveness of risk management system implemented of flyover construction projects in Kelantan. Throughout the recent years, the effectiveness of risk management has been dawdling in various sectors within the construction industry. Thus, this research will be executed in hope of encouraging every party involved in planning out the risk management system to develop one with potential maximum effectiveness to ensure the safety of the workers and site occupiers, to minimize loss and damages by combating the possible threats that may occur on site. The data will be gathered by distributing questionnaires to involved parties on the site. The collection of information will be analyzed thoroughly to produce a definite conclusion from the research that may help with the issue.

Metadata

Item Type: Student Project
Creators:
Creators
Email / ID Num.
Mohamed, Arifatun Aqilah
2020453216
Subjects: T Technology > TH Building construction > Estimates. Measurements. Quantities and cost
T Technology > TH Building construction > Management of the construction site. Superintendence of building construction
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Programme: Bachelor of Quantity Surveying (Hons)
Keywords: Risk management, Flyover projects, Construction industry, Project effectiveness, Kelantan, Quantity surveying
Date: 2021
URI: https://ir.uitm.edu.my/id/eprint/130634
Edit Item
Edit Item

Download

[thumbnail of 130634.pdf] Text
130634.pdf

Download (198kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:
Processing

ID Number

130634

Indexing

Statistic

Statistic details