ENT300: general guidelines for operational plan part 3

Kamaludin, Mohd Ariff and Nik Jaafar, Nik Fazlin Hiryati and Nik Hassan, Nik Fakrulhazri and Ibrahim, Norlaila (2022) ENT300: general guidelines for operational plan part 3. Bulletin. Fakulti Pengurusan Perniagaan, UiTM Terengganu.
Abstract

List of machineries and equipment. Number of machineries and equipment needed must be calculated using a formula in order to make sure it is enough to cover the production. The price of these machineries and equipment must not be made based on assumptions. A survey should be carried out to get the accurate pricing.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 129285.pdf]
Text
129285.pdf
Download (498kB)
Indexing & Metrics