ENT300: general guidelines for operational plan part 3

Kamaludin, Mohd Ariff and Nik Jaafar, Nik Fazlin Hiryati and Nik Hassan, Nik Fakrulhazri and Ibrahim, Norlaila (2022) ENT300: general guidelines for operational plan part 3. Bulletin. Fakulti Pengurusan Perniagaan, UiTM Terengganu.

Abstract

List of machineries and equipment. Number of machineries and equipment needed must be calculated using a formula in order to make sure it is enough to cover the production. The price of these machineries and equipment must not be made based on assumptions. A survey should be carried out to get the accurate pricing.

Metadata

Item Type: Monograph (Bulletin)
Creators:
Creators
Email / ID Num.
Kamaludin, Mohd Ariff
mohariff@uitm.edu.my
Nik Jaafar, Nik Fazlin Hiryati
nikfa738@uitm.edu.my
Nik Hassan, Nik Fakrulhazri
nikfa480@uitm.edu.my
Ibrahim, Norlaila
norla5454@uitm.edu.my
Contributors:
Contribution
Name
Email / ID Num.
Chief Editor
Mohd Zahari, Ahmad Suffian
ahmadsuf@uitm.edu.my
Subjects: L Education > LG Individual institutions > Asia > Malaysia > Universiti Teknologi MARA > Terengganu
Divisions: Universiti Teknologi MARA, Terengganu > Dungun Campus > Faculty of Business and Management
Journal or Publication Title: BizNewz
ISSN: 2600 9811
Keywords: Machineries, Equipment
Date: 2022
URI: https://ir.uitm.edu.my/id/eprint/129285
Edit Item
Edit Item

Download

[thumbnail of 129285.pdf] Text
129285.pdf

Download (498kB)

ID Number

129285

Indexing

Statistic

Statistic details