Technical talk for Forensic Engineering (CEG562) critical slope risk engineering at Cameron Highland

Ahmad, Juhaizad and Ng, Wen Kuan and Ibrahim, Anas and Tey, Li Sian and Abd Aziz, Noraziyan (2025) Technical talk for Forensic Engineering (CEG562) critical slope risk engineering at Cameron Highland. Bulletin. Unit Penerbitan FKAPP, UiTM Cawangan Pulau Pinang.

Abstract

A technical talk was held by Forensic Engineering (CEG562) lecturers on 4 December 2024. The invited speaker was Mr Ali Mutahir Ibrahim, Project Engineer for Pintas Utama Sdn. Bhd. The topic for the technical talk is Critical Slope Risk Engineering at Cameron Highland. This interesting topic was chosen because there have been a lot of slope failure events that have occurred, especially at this tourist attraction spot. Besides, this topic is a part of a sub-topic for this course. On top of that, it is the highest slope rehabilitation works conducted in Malaysia. The specific project shared by the speaker is “Projek Pembaikan Cerun Dan Membaik Pulih Jalan di Laluan FT185 Seksyen 44.1, Jalan Simpang Pulai – Blue Valley, Daerah Kinta, Perak”. The main client is Jabatan Kerja Raya (JKR). This slope rehabilitation work consists of horizontal drain & storm drainage works – chute, toe, roadside & cascade + sump, installation soil nailing – high tensile Terra Nail and local nail – 5900 nos & 3280 nos, construction of micropiles 300mm diameter, construction of hybrid reinforced earth structure -Terra Link Armastone System, rockfill & hydro vegetation works – downslope, temporary erosion protection– laying Fibromat, manual seeding, silt fence, slope re-profiling & construction of drainage system & horizontal drain at downslope, inspection and testing works – incoming material and ongoing work process, roadworks – milling and paving, binder and wearing course and EWS (Early Warning System). The slope height is more than 100m. This slope experienced many slope failures before, and the government has spent more than RM240 million to repair this slope since it is the main route to Cameron Highlands. The students were exposed to the challenges faced by this work, such as uncertain weather conditions at this site (high rainfall, dangerous for workers during heavy rainfall), heavy fog (stoppage of works due to poor visibility) and high gradient and loose soil slope with the presents of timbers within the excavation profile. The speaker shared his experience as a project engineer and as a UiTM alumni as well. He advised the students regarding their career path and what they need to furnish before entering the challenging life of an engineer.

Metadata

Item Type: Monograph (Bulletin)
Creators:
Creators
Email / ID Num.
Ahmad, Juhaizad
UNSPECIFIED
Ng, Wen Kuan
UNSPECIFIED
Ibrahim, Anas
UNSPECIFIED
Tey, Li Sian
UNSPECIFIED
Abd Aziz, Noraziyan
UNSPECIFIED
Contributors:
Contribution
Name
Email / ID Num.
Advisor
Pakir Mohamed Latiff, Muhamad Faizal
UNSPECIFIED
Chief Editor
Kuan, Woei Keong
UNSPECIFIED
Subjects: L Education > LG Individual institutions > Asia > Malaysia > Universiti Teknologi MARA > Pulau Pinang
L Education > LG Individual institutions > Asia > Malaysia > Universiti Teknologi MARA
Divisions: Universiti Teknologi MARA, Pulau Pinang > Permatang Pauh Campus > Faculty of Civil Engineering
Universiti Teknologi MARA, Pulau Pinang > Permatang Pauh Campus
Journal or Publication Title: Buletin Tahunan Fakulti Kejuruteraan Awam
ISSN: 2716-6325
Keywords: Slope rehabilitation, Construction, Hybrid
Date: 2025
URI: https://ir.uitm.edu.my/id/eprint/126141
Edit Item
Edit Item

Download

[thumbnail of 126141.pdf] Text
126141.pdf

Download (801kB)

ID Number

126141

Indexing

Statistic

Statistic details