Abstract
The course of Mechanical and Electrical Engineering is offered to Part 3 of Bachelor Degree in Civil Engineering (EC223) students. One of the topics in the course is Wastewater Treatment Process. A visit to the Centralized Sewage Treatment Plant (Loji Kumbahan Terpusat) in UiTM Cawangan Pulau Pinang was carried out with the consent from the Facility Unit to expose our students of the practices. The capacity of the treatment is 10,000 PE. It is gated and locked to avoid trespassing by individual without the proper consent by Facility Unit. According to the facilitator, the first step of the process is Primary Mechanical Screen, which aims to remove physical objects such as papers and plastics to prevent damage and clogging of downstream equipment, piping, and appurtenances.
Metadata
| Item Type: | Monograph (Bulletin) |
|---|---|
| Creators: | Creators Email / ID Num. Chan, Hun Beng UNSPECIFIED Raja Mohd Noor, Raja Nor Husna UNSPECIFIED Musir, Adhilla Ainun UNSPECIFIED Keria, Roziah UNSPECIFIED Kamarudin, Faizah UNSPECIFIED Zakariah, Zulfairul UNSPECIFIED |
| Contributors: | Contribution Name Email / ID Num. Advisor Pakir Mohamed Latiff, Muhamad Faizal UNSPECIFIED Chief Editor Kuan, Woei Keong UNSPECIFIED |
| Subjects: | L Education > LG Individual institutions > Asia > Malaysia > Universiti Teknologi MARA > Pulau Pinang L Education > LG Individual institutions > Asia > Malaysia > Universiti Teknologi MARA |
| Divisions: | Universiti Teknologi MARA, Pulau Pinang > Permatang Pauh Campus > Faculty of Civil Engineering Universiti Teknologi MARA, Pulau Pinang > Permatang Pauh Campus |
| Journal or Publication Title: | Buletin Tahunan Fakulti Kejuruteraan Awam |
| ISSN: | 2716-6325 |
| Keywords: | Centralized Sewage Treatment Plant (Loji Kumbahan Terpusat), Mechanical, Clogging of downstream |
| Date: | 2025 |
| URI: | https://ir.uitm.edu.my/id/eprint/125768 |
