Abstract
This report is about the staircase in building construction and the focus was on the reinforced concrete staircase. The information that was needed on the work by the practical training and interview with all the staff in charge at the KTCC Mall, Kuala Terengganu. This project started at the 1st of October 2018 and scheduled to complete at the year of 2020. It takes about 1 years to complete this project with the cost of approximately RM 109,000,000.00. The main purpose is to know about construction procedures to provide the details of the construction techniques for RCC staircase or methods in sequence also the locations, cost of projects, type or size of project, others consultant or professional involved and machineries involved. This is to make sure that the staircase construction can be finished according to plan and can be maintained.
Metadata
| Item Type: | Monograph (Industrial Training) |
|---|---|
| Creators: | Creators Email / ID Num. Tengku Nazmi, Tengku Muhammad Anwar 2017213364 |
| Contributors: | Contribution Name Email / ID Num. Thesis advisor Ibrahim, Azira UNSPECIFIED Thesis advisor Mahyuddin, Muhammad Naim UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
| Subjects: | T Technology > TH Building construction > Estimates. Measurements. Quantities and cost T Technology > TH Building construction > Building fittings and their installation |
| Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
| Keywords: | Reinforced, Concrete, Staircase |
| Date: | 2019 |
| URI: | https://ir.uitm.edu.my/id/eprint/121308 |
