Abd Wahid, Muhammad Muiz
  
(2019)
Pile cap construction at Kuchai East Project, Kuala Lumpur.
    Industrial Training.
    Universiti Teknologi MARA, Perak.
  
   (Unpublished)
  
  
  
  
  Abstract
Pile caps are constructed to group, and Iink piles together. The number of piles in the group can be three or more. The number of piles and the space between them could determine the shape of the pile cap. This report precludes the necessity of a pile cap. There are two objectives which are to study the construction method of pile cap and to identify the problems in constructing it. To gain required information regarding pile cap, four methods of study are used which are by own observation, interviewing person in charge for the construction such as Site Engineer, from document review and information from the internet.
Metadata
| Item Type: | Monograph (Industrial Training) | 
|---|---|
| Creators: | Creators Email / ID Num. Abd Wahid, Muhammad Muiz 2016171039 | 
| Contributors: | Contribution Name Email / ID Num. Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED Thesis advisor Mahyuddin, Muhammad Naim UNSPECIFIED | 
| Subjects: | T Technology > TH Building construction > Management of the construction site. Superintendence of building construction T Technology > TH Building construction > Architectural engineering. Structural engineering of buildings | 
| Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying | 
| Keywords: | Pile cap construction, Pile foundation, Kuchai East Project | 
| Date: | 2019 | 
| URI: | https://ir.uitm.edu.my/id/eprint/120545 | 
 
				
![[thumbnail of 120545.pdf]](https://ir.uitm.edu.my/style/images/fileicons/text.png)
 
		