The implementation of just in time (JIT) in construction project / Munzir Ismail Niza

Ismail Niza, Munzir (2012) The implementation of just in time (JIT) in construction project / Munzir Ismail Niza. [Student Project] (Unpublished)

Abstract

The implementation of Just In Time (JIT) in construction project in Malaysia has started since the early on 1990. in the early stage, this concept is beginning from industry motoring companies which is producing the car (Toyota). The study was covers the process of producing a product to be produced based on demand and citizen of the country's population. Through this concept, it has grown to companies that carry out the construction development. This study is conducted to fulfill writer research objective to identify the concept of “Just In Time” (JIT) in Malaysia where to investigate which part of the concept “Just In Time” will be used in Malaysia industry construction. Besides, it also wants to determine whether the JIT concept can have a significant impact on small-scale project in terms of cost, time and quality. Methodology of this study carried out in four stages in order to get a source for the primary and secondary data. Primary data writer had drafted a sample of questionnaire and distributes to relevant respondents to get a feedback regarding research. Secondary data are collecting by reading books, journals and articles from related previous study. Respondent are dividing in 4 groups level which is project manager, engineer, site supervisor and staff officer. Locations of the research case study were in Selangor State (Pandan Indah, Serdang and Cheras) and Putrajaya. The analysis and finding give the result of study that implementing JIT at the site area. This study was explained about the effectiveness by doing the concept and the results of implementing in works.

Metadata

Item Type: Student Project
Creators:
Creators
Email / ID Num.
Ismail Niza, Munzir
2010890876
Contributors:
Contribution
Name
Email / ID Num.
Advisor
Khalid, Ellemy Iskandar
UNSPECIFIED
Subjects: T Technology > TS Manufactures > Production management. Operations management > Production control > Just-in-time systems
Divisions: Universiti Teknologi MARA, Shah Alam > Faculty of Architecture, Planning and Surveying
Programme: Bachelor of Building Surveying (Hons)
Keywords: Just in time (JIT), construction project, demand
Date: 2012
URI: https://ir.uitm.edu.my/id/eprint/108824
Edit Item
Edit Item

Download

[thumbnail of 108824.pdf] Text
108824.pdf

Download (265kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:

ID Number

108824

Indexing

Statistic

Statistic details