An integrated computer package for productivity, cost control and schedule control systems (INPROMA) / Noorman Nordin

Nordin, Noorman (1993) An integrated computer package for productivity, cost control and schedule control systems (INPROMA) / Noorman Nordin. Advanced Diploma thesis, MARA Institute of Technology.

Abstract

Most project analysist have the dream of integrating cost, productivity and schedule function. In practice it is very difficult to achieve the same. Often it is observed CPM engineers producing schedules and cost engineers working on budget and completion status, with little correlation between this three function. This project attempt to developed a software package which will make the three function integrate or related each others.

Metadata

Item Type: Thesis (Advanced Diploma)
Creators:
Creators
Email / ID Num.
Nordin, Noorman
UNSPECIFIED
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Ismail, Ariffin
UNSPECIFIED
Subjects: Q Science > QA Mathematics > Instruments and machines > Electronic Computers. Computer Science
Divisions: Universiti Teknologi MARA, Shah Alam > Faculty of Civil Engineering
Programme: Advanced Diploma in Civil Engineering
Keywords: Software package,CPM engineers
Date: 1993
URI: https://ir.uitm.edu.my/id/eprint/104886
Edit Item
Edit Item

Download

[thumbnail of 104886.pdf] Text
104886.pdf

Download (131kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:

ID Number

104886

Indexing

Statistic

Statistic details