Abstract
Risk management plays a pivotal role in safeguarding the success and safety of construction projects, particularly for slope repair works involving innovative methods. In Malaysia, the Terralink Construction Method was the new method used for the slope repair project at Simpang Pulai-Blue Valley Road. However, there is no existing risk management plan for the Terralink Construction Method. Hence, this study focuses on the Terralink Construction Method, a newly adopted technique in Malaysia, and aims to develop a risk management plan for slope repair using the Terralink Construction Method. The research objectives include identifying hazards inherent to this method, analysing associated risks, and developing a risk management plan that aligns with regulatory directives under Arahan KPKR 29/2023.
Metadata
Item Type: | Thesis (Masters) |
---|---|
Creators: | Creators Email / ID Num. Mohd Kabri, Muhamad Afiq Al-Amin 2023204266 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Ahmad, Nur Azfahani UNSPECIFIED Thesis advisor Che Ahmad, Asmalia UNSPECIFIED Thesis advisor Wan Hamdan, Wan Samsul Zamani UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Architectural engineering. Structural engineering of buildings > Sustainable buildings. Sustainable construction |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Programme: | Master of Science in Green Architecture |
Keywords: | Slope stabilization risk assessment, Terralink Construction Method, Sustainable slope repair techniques |
Date: | 2025 |
URI: | https://ir.uitm.edu.my/id/eprint/104863 |
Download
![[thumbnail of 104863.pdf]](https://ir.uitm.edu.my/style/images/fileicons/text.png)
104863.pdf
Download (195kB)
Digital Copy
Physical Copy
ID Number
104863
Indexing

