Reinforced concrete building design project: Project based learning (Case Study)/ Nik Nurul Rasyiqah Nik Mohd Rafiza

Nik Mohd Rafiza, Nik Nurul Rasyiqah (2021) Reinforced concrete building design project: Project based learning (Case Study)/ Nik Nurul Rasyiqah Nik Mohd Rafiza. [Student Project] (Unpublished)
Abstract

From this design work, it can summarize that there have slight differences between manual calculation and PROKON calculation. This is because the manual calculation using a different formula based on appendix and it based on Eurocode 2. While, compared with PROKON calculation, it used varies formula based on Eurocode 2 and BS. That way both of it got the different value than manual calculation. Moreover, the manual calculation it was taken a long time to calculate because if the structure was deflected it must redesign again with the new parameters. But, for PROKON calculation, it will easily to used and it will give more accurate result in term of calculation but requires correct data input from a human. This is because the PROK ON calculation can be got from generating the input for those structures. So there will be no wrong calculation in terms of formula or digit number. If there are wrong maybe because of human capability. In conclusion, the PROKON calculation can help the engineer in future or now to solve and design their building. This is because they can easily estimate and get good data from that software than manual calculation.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 104192.pdf]
Text
104192.pdf
Download (149kB)
Location & Physical Holdings
Digital Copy
Physical Location
  • Bilik Koleksi Akses Terhad | PTAR Kampus Pasir Gudang, Johor
Item Status
On Shelf
Indexing & Metrics