Items where Division is "Faculty of Business and Management" and Year is 1994

Group by: Creators | Item Type | No Grouping
Number of items: 36.

Thesis

The evaluations on scheduling and routing of Maju stage bus services in Dato'Onn area towards Johor Bahru city status / Norhayati Abd.Rahman. (1994) Degree thesis, thesis, Universiti Teknologi MARA.

Operating efficiency of Esso Malaysia Berhad's tank trucks / Zulkiffli Ahmad. (1994) Diploma thesis, thesis, Universiti Teknologi MARA (UiTM).

The profitability analysis of factoring companies in Malaysia / Mohd Ridhuan Harun. (1994) Diploma thesis, thesis, Universiti Teknologi MARA.

Analysis on the frequency of passenger train delay (Keretapi Tanah Melayu Berhad) / Khadijah Ishak. (1994) Degree thesis, thesis, Universiti Teknologi MARA.

A one year plan for Pennzoil passenger car motor oils / Mohd Noor Afandy Mohd Jaya. (1994) Diploma thesis, thesis, Insititut Teknologi MARA.

A study on the effect of vessels delay and shut out of containers on MISC coastal liner service / Mohd Suhaimi Akbar Mohd Ramli. (1994) Diploma thesis, thesis, Mara Institute of Technology.

The effectiveness of material handling towards upgrading the operations of Sime Swede Distribution Services / Sukmawati Mohd. Sanusi. (1994) Degree thesis, thesis, Universiti Teknologi MARA.

Bus service in Damansara and its surrounding areas (Sri Jaya no.244) / Rozainor Mohd. Yunus. (1994) Degree thesis, thesis, Universiti Teknologi MARA.

Investment opportunities in Subang Jaya focus on : the popular types of development and their respective yields / Rohainee Muhamad. (1994) Degree thesis, thesis, Universiti Teknologi MARA.

Ekspres Nasional Berhad then, now and future / Nurhayati Othman. (1994) Diploma thesis, thesis, Universiti Teknologi MARA Shah Alam.

Factors influencing the rate of returns on initial public offerings a study on : KLSE’s second board / Rashdan Saferan Saat. (1994) Degree thesis, thesis, Universiti Teknologi MARA.

Student Project

Marketing plan: the development and establishment of the GFSB showrooms / Aizatul Azhar Abd Ghani. (1994) [Student Project] (Unpublished)

Semai Impian Sdn Bhd Executive coach: an analysis on diversification of service in promoting the executive coach operation / Miftah Abd Mutalib. (1994) [Student Project] (Unpublished)

Liquidity analysis of finance companies and effect of economic indicators: a liquidity management perspective / Hezal Ahmad. (1994) [Student Project] (Unpublished)

Evaluating risks and returns of preference shares and the possibilities to introduce an Islamic Proposed formula of preference shares / Zaidun Ahmad. (1994) [Student Project] (Unpublished)

A study on how tourism Malaysia promote Malaysia as a major tourist destination / Aini Dakhlah Baharuddin. (1994) [Student Project] (Unpublished)

A study of customer service rendered by Container Haulage, Kontena National, (Port Klang) / Hazlinda Hashim. (1994) [Student Project] (Unpublished)

A study on bumiputera investment in manufacturing sector in Malaysia (1984 -1993) / Mohd. Hafis Hashim. (1994) [Student Project] (Unpublished)

A study of passenger handling practices at Pelangi Air Sendirian Berhad / Abdul Halim Hassan. (1994) [Student Project] (Unpublished)

The analysis of relationship between profitability ratios of finance companies with economic indicators and market interest rates / Mohd Kamal Husin. (1994) [Student Project] (Unpublished)

Planning for public transport access from Kuala Lumpur to National Sport Complex / Sharizal Ismail. (1994) [Student Project] (Unpublished)

Service marketing and quality of service provided by Selangor Industrial Corporation Sdn Bhd / Noriha Md Noor. (1994) [Student Project] (Unpublished)

A study on container delivery and collection in relationship to trailer utilisation: Kontena Nasional Sdn Bhd / Norliyati Mohamed. (1994) [Student Project] (Unpublished)

Beta of shares on the second board / Rozita Mohamed. (1994) [Student Project] (Unpublished)

A study on the operational problems of conventional breakbulk general cargo handling system and its future prospect in KPM Sdn Bhd / Norteja Mohd Hussain Albakri. (1994) [Student Project] (Unpublished)

The arbitrage pricing theory : a study on the risk- return relationship in the Kuala Lumpur stock exchange / Mohd Lokman Mohd Kassim. (1994) [Student Project] (Submitted)

A feasibility study to introduce modern city buses for intra city operations by the year 2000 / Ahmad Khairul Mohd Khusairi. (1994) [Student Project] (Unpublished)

The role of public transport (stage bus) in providing mobility to the impaired travellers in Kuala Lumpur with reference to SJ Kenderaan Sendirian Berhad / Mizahanita Mohd. Din. (1994) [Student Project] (Unpublished)

The application of information technology in the light rapid transit organisation / Anida Muda. (1994) [Student Project] (Unpublished)

The impact of demand deposit and time deposit on the statutory reserve requirement / Hasri Mustafa @ Abdul Razak. (1994) [Student Project] (Submitted)

Feeder - bus network for LRT at Gombak area / Yusra Narais. (1994) [Student Project] (Unpublished)

A study on safety aspects of container fleet movement in reference to Kontena Nasional Sdn. Bhd. at Port Klang / Al Zelan Shamsudin. (1994) [Student Project] (Unpublished)

A study on the service quality and consumers perception towards it / Shuhaniza Shamsul Khalil. (1994) [Student Project] (Unpublished)

Fleet operation at ICD in relation to Kontena Nasional Sdn. Berhad / Wan Faizal Sazali Wan Mohd. Isa. (1994) [Student Project] (Unpublished)

Container undischarged problem in Nepline Sdn. Bhd (Port Klang Branch) / Anuar Yazid. (1994) [Student Project] (Unpublished)

Research Reports

Logistics customer service: analysis regards to implementation of order processing in Shapadu Kontena Berhad / Abdul Halim N. C. Mohamad. (1994) [Research Reports] (Unpublished)

This list was generated on Fri May 3 12:35:16 2024 UTC.