As we know this Plant Engineering subject is the main subject that has been taken for the diploma Mechanical Engineering (manufacturing) students. In this subject has a one-hour segment for the students do the lab at the workshop. There are five experiments that have to do by the students.
First and second experiment is alignment machine. The machines are lathe and milling machine. The purpose of this experiment is to make sure the machine is in stable position to use.
Third experiment is machine installation. Spirit level is used in this experiment in order to do leveling. Fourth experiment is pump service, whereby the process of install and uninstall has been done. The last experiment is mounting and dismounting bearing. It is to show the correct method or technique to mounting and dismounting bearing without damage the shaft and the bearing.
We hope with this experiment, the student more understand what they learn about this subject in the class
Metadata
Item Type: | Student Project |
---|---|
Creators: | Creators Email / ID Num. Abu Zaki, Muhamad Faiz 2002362400 Bastani, Mohd Alijufri 2002362457 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Aziz, Mohd Rozaiman UNSPECIFIED |
Subjects: | T Technology > TJ Mechanical engineering and machinery > Machine shops and machine shop practice T Technology > TJ Mechanical engineering and machinery > Machine shops and machine shop practice > Machine tools and machining T Technology > TJ Mechanical engineering and machinery > Machine shops and machine shop practice > Machine tools and machining > Abrading machinery. Grinding, lapping, etc. Sharpening |
Divisions: | Universiti Teknologi MARA, Johor > Pasir Gudang Campus > Faculty of Mechanical Engineering |
Programme: | Diploma Of Mechanical Engineering |
Keywords: | Alignment Machine, Pump Service, Dismounting Bearing |
Date: | November 2005 |
URI: | https://ir.uitm.edu.my/id/eprint/48076 |
Download
48076.PDF
Download (87kB)