Dunging, Roland Royston Runggah
(2020)
Integration of Supply Chain Management (SCM) in Industrialised Building System (IBS) / Roland Royston Runggah Dunging.
Degree thesis, Universiti Teknologi MARA Cawangan Sarawak.
Abstract
In the world of the construction industry, it has been understood that it involves multiple parties and organizations in handling a project which has been criticized as a fragmented sector. These have resulted in creating a network of determination and commitment to work with one another in a properly ethical manner. Thus, resulting in this need proper action and the right practices to be adapted in order to undertake work in an environment where all unwanted can be hinder. This is because handling and adapting the right supply chain practices in handling lndustrialised Building
System (lBS) is fragile, and thus limited uptake of IBS will be one of the negative impacts.
Metadata
Item Type: | Thesis (Degree) |
---|---|
Creators: | Creators Email / ID Num. Dunging, Roland Royston Runggah 2018287462 |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > Construction industry T Technology > TH Building construction > Systems of building construction. Industrialized building T Technology > TH Building construction > Management of the construction site. Superintendence of building construction |
Divisions: | Universiti Teknologi MARA, Sarawak > Kota Samarahan Campus > Faculty of Architecture, Planning and Surveying |
Programme: | Bachelor of Quantity Surveying (Honors) |
Keywords: | Supply Chain Management (SCM), Industrialised Building System(lBS), practices, challenges, strategies |
Date: | June 2020 |
URI: | https://ir.uitm.edu.my/id/eprint/37449 |
Download
Text
37449.pdf
Download (2MB)
37449.pdf
Download (2MB)
Digital Copy
Digital (fulltext) is available at:
Physical Copy
Physical status and holdings:
Item Status:
On Shelf