Factory layout at WH furniture & works sdn. bhd: an application of flow diagram and process chart/ Azfawani Hj Mohd Azami, Hamizah Jamhari& Mohamad Norjayadi Tamam

Hj Mohd Azami, Azfawani and Jamhari, Hamizah and Tamam, Mohamad Norjayadi (2010) Factory layout at WH furniture & works sdn. bhd: an application of flow diagram and process chart/ Azfawani Hj Mohd Azami, Hamizah Jamhari& Mohamad Norjayadi Tamam. [Student Project] (Unpublished)
Abstract

This chapter provides an introduction to the applied business project. It first illustrates on an overview of the background of study which explained in general the furniture industry in Malaysia. Then it covers the background of the company in brief and later specifies the problem statement which leads to the research objectives and questions, scope of study, significance of study and finally the limitation that we encountered when conducting this study. Lastly this chapter elaborated on the main definition of our study.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 81165.pdf]
Text
81165.pdf
Download (434kB)
Location & Physical Holdings
Digital Copy
Physical Location
  • Koleksi Akses Terhad | PTAR Kampus Samarahan, Sarawak
Item Status
On Shelf
Indexing & Metrics