Application and design of production room layout with 5S - ARC method to reduce waste (case study on rubber industry production) / Aldilo Dwi Rashindra … [et al.]

Rashindra, Aldilo Dwi and Zulkarnaen, Ghiyats Septio and Pahala, Yosi and Deslida Saidah (2023) Application and design of production room layout with 5S - ARC method to reduce waste (case study on rubber industry production) / Aldilo Dwi Rashindra … [et al.]. Malaysian Journal of Computing (MJoC), 8 (1): 12. pp. 1414-1426. ISSN 2600-8238
Identification Number (DOI): 10.24191/mjoc.v8i1.20479
Abstract

This study aims to get good production facility layout recommendations to reduce material handling distance in the company. This is intended so that the production process can run optimally. This study examined the rubber processing industry located in Bogor patent where the production process in this industry still uses simple methods. This causes a significant amount of waste in the production system in the industry. Therefore, this study discussed the redesign of the production room layout by using ARC proximity (Activity Relation Chart), which is a method to see the level of intimacy between activities in the production process. It also examines the work culture in industrial production using the 5S method. The results of this study show that there is a reduction in the distance and time of movement of goods in the production process with 2 alternative layout proposals contained in this scientific research.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 77377.pdf]
Text
77377.pdf
Download (396kB)
Indexing & Metrics