The best practice of Centralized Labour Quarters (CLQ) for Work Package Contractors (WPC) of Mass Rapid Transit (MRT) project

Zully Romzi, Muhamad Afiq (2019) The best practice of Centralized Labour Quarters (CLQ) for Work Package Contractors (WPC) of Mass Rapid Transit (MRT) project. [Student Project] (Unpublished)
Abstract

The introduction of the Centralized Labour Quarters (CLQ) through the Mass Rapid Transit (MRT) project is still new in the construction industry. Therefore, there are alterations to be effected in the long run. Fortunately, the high standards set by the first MRT project, is a benchmark for other construction sites to apply in their construction projects. The aim of this research is to investigate the best practice of Centralized Labour Quarters (CLQ) based on Mass Rapid Transit line 2 (MRT2) project for the Work Package Contractors (WPC). A questionnaire survey was conducted on 10 WPC of the MRT project. The data collected was analysed using SPSS version 25. The result indicates that 5 out of 10 components are necessary to be recommended for the construction sites, thus the best practice and standard specification to be apply in CLQ specifically electricity, building, first aid and medical facilities, management team, water, drainage, water disposal and security of workers. Majority of these findings are in compliance with Malaysian Standard (MS). However, there are several improvements proposed to further promote and develop a sustainable environment of the housing quarters and amenities for other CLQ.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 148526.pdf]
Text
148526.pdf
Download (250kB)
Location & Physical Holdings
Digital Copy
Physical Location
Item Status
Processing
Indexing & Metrics