Mat Jusoh, Muhammad Anuar
(2010)
Lightning risk assessment for Canseleri UiTM building and interface with GUI: article.
pp. 1-6.
Abstract
This report presents the lightning risk assessment for Canseleri U iTM building based on Malaysian Standard MS 62306. Based on assessment R1 shall be determined and compared with tolerable risk value RT= 10-5_ Protection is required if the risk R1 is higher than tolerable risk, RT lightning protection required for structure. This report also presents the result of Zone 3 (office building) in GUI method using MATLAB software as an alternative to mathematical method.
Item Details
| Item Type: | Article |
|---|---|
| Creators: | Creators Email / ID Num. Mat Jusoh, Muhammad Anuar UNSPECIFIED |
| Subjects: | T Technology > TH Building construction > Systems of building construction. Industrialized building T Technology > TH Building construction > Protection of buildings. Including protection from dampness, fire, burglary |
| Divisions: | Universiti Teknologi MARA, Shah Alam > Faculty of Electrical Engineering |
| Page Range: | pp. 1-6 |
| Keywords: | GUI method, risk assessment, Canseleri UiTM building, tolerable risk. |
| Date: | May 2010 |
| URI: | https://ir.uitm.edu.my/id/eprint/144807 |
Downloads & Files
Text
144807.pdf
Download (232kB)
144807.pdf
Download Statistics
