Abstract
The assembly line process has been widely used by most manufacturing industries all over the world. In the production systems, the workpieces of the products will be assembled in line and passed through several workstations before they turn into finished products. However, there exists a problem in the assembly line process by which the management always deal with unbalancing of the assembly work among the workstations. It is hard for the management to optimize the number of workstations without violating the restriction of the line such as precedence relations among the task. Therefore, from the above matter, this study will solve the Simple Assembly Line Balancing Problem Type 1 (SALBP-1) by minimizing the number of workstations to complete all tasks based on the given cycle time and task time using firefly algorithm. Hence, the number of tasks assigned for each workstation is determined where the total task time for each workstation will not exceeding the cycle time. Thus, the optimal number of workstations needed for 9 tasks is 4 and the total task time for each workstation is not exceeding 10 minutes. As for the recommendation, other metaheuristic and the trend for algorithm hybridization can be applied with the aims of minimizing the number of workstation for SALBP-1.
Metadata
Item Type: | Thesis (Degree) |
---|---|
Creators: | Creators Email / ID Num. Zawani Zulkifli, Nurhani 2016351685 |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > Manufacturing industries Q Science > QA Mathematics > Philosophy > Mathematical logic > Constructive mathematics > Algorithms |
Divisions: | Universiti Teknologi MARA, Perlis > Arau Campus > Faculty of Computer and Mathematical Sciences |
Programme: | Management Mathematics |
Keywords: | Task Allocation ; Production Systems ; Firefly Algorithm ; Simple Assembly Line Balancing Problem Type 1 (SALBP-1) |
Date: | 13 October 2020 |
URI: | https://ir.uitm.edu.my/id/eprint/35151 |
Download
35151.pdf
Download (307kB)