Success factors for initial works of industralised building system process of projects implementation / Faridah Ismail, Norazian Mohamad Yusuwan and Har Einur Azrin Baharuddin.

Ismail, Faridah Hanim and Mohamad Yusuwan, Norazian and Baharuddin, Har Einur Azrin (2018) Success factors for initial works of industralised building system process of projects implementation / Faridah Ismail, Norazian Mohamad Yusuwan and Har Einur Azrin Baharuddin. Asian Journal of Environment-Behaviour Studies, 3 (9). pp. 1-13. ISSN 2514-751X

Abstract

The absence of success factors focusing on the Industrialised Building System (IBS) process of project implementation initiates this study. Therefore, the aim of this research is to establish the success factors within the initial works of the IBS process of project implementation. Comprehensive literature review revealed that success factors are; the management, the government policies and initiatives, the coordination between design and construction, and the technical aspects of project deliverables. Questionnaire survey distributed amongst G7, IBS contractors unanimously agreed on these as success factors for the initial works of the IBS process of project implementation.

Metadata

Item Type: Article
Creators:
CreatorsID Num. / Email
Ismail, Faridah Hanimfarid346@salam.uitm.edu.my
Mohamad Yusuwan, NorazianUNSPECIFIED
Baharuddin, Har Einur AzrinUNSPECIFIED
Subjects: T Technology > TH Building construction > Systems of building construction. Industrialized building
T Technology > TH Building construction > Systems of building construction. Industrialized building > Malaysia
Divisions: Universiti Teknologi MARA, Selangor > Puncak Alam Campus > Faculty of Architecture, Planning and Surveying
Journal or Publication Title: Asian Journal of Environment-Behaviour Studies
Journal: Others > Asian Journal of Environment-Behaviour Studies
ISSN: 2514-751X
Volume: 3
Number: 9
Page Range: pp. 1-13
Official URL: https://aje-bs.e-iph.co.uk/index.php/ajE-Bs/articl...
Item ID: 29801
Uncontrolled Keywords: Management Factors, Industrialised Building System, Successful Project Implementation, IBS Processes
URI: http://ir.uitm.edu.my/id/eprint/29801

Download

[img] Text
AJ_FARIDAH ISMAIL AJE-BS B 18.pdf

Download (363kB)

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year