Ibrahim, Mohd Nazlizan and Abdul Hamid, Norhissham and Wan Mohamad, Wan Nazrul Faizal
(2002)
Work study in factory (cable slack making operation) / Mohd Nazlizan Ibrahim, Norhissham Abdul Hamid and Wan Nazrul Faizal Wan Mohamad.
[Student Project]
(Unpublished)
Abstract
Work study is the systematic analysis of all facets of a job with the objective of arranging it so that maximum efficiency is obtained from labor, plant, equipment, materials and supervision. It achieves this by detailed examination and recording of all the various aspects of the job so that all relevant information will be brought to light and presented to management to enable them to make the right decisions instead of using intuitive guess work. The human aspect is the most important part of work-study, both on site and at higher management level and the subject consist just as much of human relations as it does of techniques.
Metadata
Item Type: | Student Project |
---|---|
Creators: | Creators Email / ID Num. Ibrahim, Mohd Nazlizan UNSPECIFIED Abdul Hamid, Norhissham UNSPECIFIED Wan Mohamad, Wan Nazrul Faizal UNSPECIFIED |
Subjects: | T Technology > TJ Mechanical engineering and machinery > Mechanical devices and figures. Automata. Ingenious mechanisms.Robots (General) |
Divisions: | Universiti Teknologi MARA, Shah Alam > Faculty of Mechanical Engineering |
Keywords: | factory, cable slack, cable slack making operation |
Date: | 2002 |
URI: | https://ir.uitm.edu.my/id/eprint/26052 |
Download
Text
PPd_MOHD NAZLIZAN IBRAHIM EM 02_5.pdf
Download (3MB)
PPd_MOHD NAZLIZAN IBRAHIM EM 02_5.pdf
Download (3MB)
Digital Copy
Digital (fulltext) is available at:
Physical Copy
Physical status and holdings:
Item Status: