Flood estimation analysis on Sg Ara catchment / Judy Primus

Primus, Judy (2005) Flood estimation analysis on Sg Ara catchment / Judy Primus. Student Project. Faculty Of Civil Engineering, Penang. (Submitted)

[img] Text
PPb_ JUDY PRIMUS EC P 05_5..pdf

Download (17kB)

Abstract

Flood becomes one of the major critical problems in Malaysia especially in the floodplain area like Pulau Pinang and Kuala Lumpur. If flood can be predicted, controlled and managed systematically, the lost due to flood such as life, properties and resources can always be prevented or at least minimized. Thus, flood estimation is needed. In this study, the method to do flood estimation is using Time-Area Method. This study depicts flood estimation analysis that was conducted for the design flood events for the design flood events for 5, 10, 20, 50 and 100 year Average recurrence Interval (ARI) with 120 minutes design rainfall duration. The result of this study indicates that the study area, Sg Ara is estimated to be flood for 5, 10, 20, 50 and 100 year Average recurrence Interval (ARI) with 120 minutes design rainfall duration. With this flood estimation analysis, the immediate action can be taken to overcome the upcoming problems.

Item Type: Monograph (Student Project)
Creators:
CreatorsEmail
Primus, JudyUNSPECIFIED
Subjects: G Geography. Anthropology. Recreation > GB Physical geography > Hydrology. Water
Divisions: Universiti Teknologi MARA, Pulau Pinang > Permatang Pauh Campus > Faculty of Civil Engineering
Item ID: 22993
Uncontrolled Keywords: flood estimation; flood
Last Modified: 04 Mar 2019 09:19
Depositing User: Perpustakaan Tun Abdul Razak UiTM Cawangan Pulau Pinang
URI: http://ir.uitm.edu.my/id/eprint/22993

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year