The work process of piles and pile caps / Mohamad Afif Mohamad Zaki

Mohamad Zaki, Mohamad Afif (2016) The work process of piles and pile caps / Mohamad Afif Mohamad Zaki. Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Download

[thumbnail of 47745.pdf] Text
47745.pdf

Download (221kB)

Abstract

This report explains about process and how to build a pile cap. Pile cap is an important element in the structural foundation, which the load from column to piles therefore this report will discuss about a piling and pile cap. This reports is divided into several part and start from background of company and background of site project. From observation, pile cap is not easy to build and if there are errors installation during the construction , it will affect the structure in the future. In this project there are have 492 number of pile cap, different shape and different size of pile cap, based on drawing. This report can explain in more detail about the process and method build a precast concrete pile and pile cap.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email
Mohamad Zaki, Mohamad Afif
2013324465
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Mat Yassin, Mohd Fadzil
UNSPECIFIED
Subjects: T Technology > TA Engineering. Civil engineering > Earthwork. Foundations > Hydraulic filling
T Technology > TA Engineering. Civil engineering > Earthwork. Foundations > Foundations
T Technology > TA Engineering. Civil engineering > Earthwork. Foundations > Foundations > Piles and pile-driving
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Item ID: 47745
Uncontrolled Keywords: Process, Piles, Pile caps
URI: https://ir.uitm.edu.my/id/eprint/47745

ID Number

47745

Indexing


View in Google Scholar

Edit Item
Edit Item