Development of performance measurement tool (PMT) for operational and maintenance phase in Malaysian Public Private Partnership (PPP) projects / Nor Suzila Lop

Lop, Nor Suzila (2019) Development of performance measurement tool (PMT) for operational and maintenance phase in Malaysian Public Private Partnership (PPP) projects / Nor Suzila Lop. PhD thesis, Universiti Teknologi MARA.

Download

[thumbnail of 35014.pdf] Text
35014.pdf

Download (203kB)

Abstract

Public Private Partnership (PPP) is conceptualised as a performance-based procurement in which concessionaires are contracted to provide efficient facilities and services to the government. The quality of the facilities and services provided by the concessionaires will be assessed using key performance indicators (KPIs). This is for determining the
level of performance against the agreed level of standards as expected by the government. However, most of the PPP projects are currently facing the difficulties in meeting the expectation. It is due to several issues such as lack of methods for measuring the KPIs, the lack of understanding of the KPI implementation, project performance not
reflecting the actual performance (physical) on site, the absence of a weightage system on KPIs, and inconsistent of works performance. These shortcomings have led to the
difficulty in determining the performance level of the PPP projects. Therefore, this research aims to develop a performance measurement tool (PMT) for assessing the
operational performance of PPP projects in Malaysia. Towards this end, the study sought to achieve the following objectives: (i) to identify the important criteria for
selecting KPIs; (ii) to investigate the implementation of KPIs in measuring the operational performance of PPP projects; (iii) to determine the relative importance weight for KPIs and (iv) to develop and validate a KPI-based method performance measurement tool for PPP projects. Two methods of empirical research using case studies (semi-structured interviews) and questionnaires via the Analytical Hierarchy Process (AHP) method were conducted within PPP stakeholders. The important criteria and appropriate KPIs were determined from the data obtained from 32 semi-structured interviews conducted across six case studies. The KPIs were subsequently prioritised according to the assigned weight attained from the AHP method. Nineteen experts of PPP project participated in the rating process. Subsequently, a performance measurement tool was developed based on the findings from both the qualitative and quantitative approaches and were validated by seven (7) PPP/FM/KPI experts in the Malaysian construction industry. The results indicate 11 important criteria to be considered when establishing the KPIs for PPP projects. The analysis also identified
36 sub-dimensions which are categorised under seven (7) elements of dimensions such as operational element, mechanical, electrical, telecommunication, civil, structural and architectural, landscape and ground and pest control and wildlife control. These KPIs, which were prioritised through the AHP process, are therefore determined as the most important KPIs that have a greater impact on project operations. The AHP results prioritised seven (7) KPIs (dimensions) based on the assigned weight namely
mechanical, electrical, operational element, civil, structural and architectural, telecommunication, landscape and ground, and pest control and wildlife control. The
proposed performance measurement tool for PPP projects (3Ps-PMT) can serve as an improved measure for assessing the operational performance of PPP projects through a
more systematic process. The 3Ps-PMT can be beneficial to the public sector (government agencies and end users) and the private sector (concessionaires and FM contractors) as PPP stakeholders.

Metadata

Item Type: Thesis (PhD)
Creators:
Creators
Email
Lop, Nor Suzila
2015471532
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Ismail, Kharizam (Dr. )
UNSPECIFIED
Subjects: N Fine Arts > NA Architecture > Architecture in relation to special subjects > Human factors and architecture
T Technology > TH Building construction > Construction by phase of the work (Building trades)
T Technology > TH Building construction > Architectural engineering. Structural engineering of buildings
Divisions: Universiti Teknologi MARA, Selangor > Puncak Alam Campus > Faculty of Architecture, Planning and Surveying
Programme: AP992
Item ID: 35014
Uncontrolled Keywords: Public Private Partnership, Performance Measurement Tool, Maintenance
URI: https://ir.uitm.edu.my/id/eprint/35014

Fulltext

Fulltext is available at:
  • Koleksi Akses Terhad | PTAR Utama | Shah Alam
  • ID Number

    35014

    Indexing


    View in Google Scholar

    Edit Item
    Edit Item