Assessing risk management maturity for construction projects in Jabatan Kerja Raya (JKR) / Saiful Jumali

Jumali, Saiful (2014) Assessing risk management maturity for construction projects in Jabatan Kerja Raya (JKR) / Saiful Jumali. Masters thesis, Universiti Teknologi MARA.

Download

[thumbnail of TM_SAIFUL JUMALI EC 14_5.pdf] Text
TM_SAIFUL JUMALI EC 14_5.pdf

Download (1MB)

Abstract

Under the Ninth Malaysia Plan (9MP), Jabatan Kerja Raya (JKR) was burdened by too many projects. Therefore, financial and time losses sometimes occurred during the process of building procurement until project implementation when managing risks not properly. The aim of this study was to assess the maturity of risk management for construction projects in JKR. In order to achieve this aim, three objectives have been outlined in this study; to establish the relationship between attributes, to identify the
high influence indices of risk management attributes for construction projects in JKR and to identify the current overall risk management maturity for construction projects in JKR. In this study, four attributes were chosen for JKR risk management maturity model. The four attributes namely culture/ awareness, experiences, processes and practices. Therefore, in this study had used four levels of maturity namely level 1: Initial, level 2: Established, level 3: Managed and level 4: Optimized. This study was conducted using a questionnaire survey among professional in all JKR branches which cover business sector, management sector, expert sector and JKR state. A total of 133 out of 580 completed questionnaires were returned. This research found a strong and positive relationship between processes attribute and experiences attribute [r=0.781,N=133, p=0.0005]. The high influence indices of risk management attributes for construction projects in JKR was the acceptance of risk management in JKR. The empirical research findings showed that the overall risk management maturity levels for construction projects in the JKR were 2.52. The four (4) attributes to assess risk management maturity for construction projects in JKR namely culture/ awareness, experiences, processes and practices were achieved between level 2 and level 3 or between “managed" and “optimized” based on the JKR Risk Management Maturity Model proposed in this research.

Metadata

Item Type: Thesis (Masters)
Creators:
Creators
Email
Jumali, Saiful
UNSPECIFIED
Subjects: H Social Sciences > HD Industries. Land use. Labor > Risk management. Risk in industry. Operational risk > Malaysia
T Technology > TE Highway engineering. Roads and pavements > Construction details. Including foundations, maintenance, equipment
Divisions: Universiti Teknologi MARA, Shah Alam > Faculty of Civil Engineering
Programme: Master of Science in Construction Engineering
Item ID: 14337
Uncontrolled Keywords: Jabatan Kerja Raya (JKR); Building procurement; Managing risks
URI: https://ir.uitm.edu.my/id/eprint/14337

Fulltext

Fulltext is available at:
  • Library Terminal Workstation (Digital Format) - Accessible via UiTM Libraries
  • ID Number

    14337

    Indexing


    View in Google Scholar

    Edit Item
    Edit Item